Based on your knowledge base
of N_PR_7150_002D_.pdf, CMMI_DEV_v1_3.pdf, and document minimum contents as
defined in SDP-SMP_Contents.txt, provide an audit compliance expected evidence
checklist for the Software Development Plan
To generate a comprehensive
audit compliance checklist for a Software Development Plan (SDP),
aligned with NASA NPR 7150.2D, CMMI-DEV v1.3, and the minimum
content guidelines provided in SDP-SMP_Contents.txt, the following
checklist is derived. It captures the required evidence and documentation
needed to demonstrate compliance:
Audit Compliance Evidence
Checklist for Software Development Plan
1. Project Organization and
Authority
- Organizational Chart:
Includes authority and responsibility of each unit, external organizations
(e.g., IV&V, SMA, Technical Authority).
- Defined Roles and Responsibilities:
Clear identification of project roles, including software engineering,
assurance, and management.
- Stakeholder Involvement:
Evidence of stakeholder participation in planning and
reviews.
2. Software Safety and
Criticality
- Software Safety-Critical Assessment:
Results of software safety criticality classification and
updates.
- Risk Management Plan:
Documented process for identifying, assessing, and mitigating
risks.
3. Software Life Cycle
Planning
- Tailored Compliance Matrix:
Approval of deviations and waivers, if any.
- Work Breakdown Structure:
Detailed WBS for all life cycle phases, activities, and
deliverables.
- Software Metrics Plan:
Defined metrics for tracking progress, quality, and
performance.
4. Verification and Validation
- Verification Methods:
Documented methods (e.g., peer reviews, inspections, test
plans).
- Validation Approaches:
Established validation methods and environments.
- Traceability Records:
Complete traceability matrix for requirements verification and
validation.
5. Configuration Management
- Configuration Management Plan:
Detailed approach covering configuration identification, control, audits,
and status accounting.
- Release Management Records:
Procedures and documentation for release and delivery of
software.
6. Process and Product Quality
Assurance
- Quality Assurance Documentation:
Evidence of QA audits, assessments, and reporting.
- Defect Management:
Logs of identified defects, resolutions, and corrective
actions.
7. Training and Communication
- Training Records:
Evidence of training for software personnel, including unique
project-specific needs.
- Communication Plan:
Defined strategy for team communications, schedules, and
reporting.
8. Documentation and
Maintenance
- Software Documentation Tree:
Detailed structure of all planned documentation for the
project.
- Document Change Control:
History and procedure for maintaining plan versions.
9. CMMI-Specific Process Areas
- Risk Management (RSKM):
Documented process for identifying and mitigating risks related to project
goals.
- Requirements Management (REQM):
Processes for documenting and maintaining software requirements.
- Project Monitoring and Control (PMC):
Evidence of monitoring plans, progress tracking, and status
reports.
Summary
This checklist integrates the
detailed expectations from NPR 7150.2D, CMMI-DEV best practices, and SDP
minimum content recommendations. Each item serves as a guide for producing the
required documentation or evidence. Tailoring should account for
project-specific needs and compliance with software classification and safety
requirements.
Based on your knowledge base
of N_PR_7150_002D_.pdf, CMMI_DEV_v1_3.pdf and document minimum contents as
defined in SCMP_Contents.txt, provide an audit compliance expected evidence
checklist for the Software Configuration Management Plan
To create a comprehensive audit
compliance checklist for a Software Configuration Management Plan (SCMP),
the following elements integrate the mandatory requirements outlined in NASA
NPR 7150.2D, CMMI-DEV v1.3, and the minimum content list from
SCMP_Contents.txt. These represent evidence that should be present to
demonstrate compliance:
Compliance Evidence Checklist
for SCMP
1. Organizational Information
- Description of the project organization(s)
with roles, responsibilities, and interfaces clearly
defined.
- Clear allocation of responsibilities for
the configuration management organization.
2. Applicable Policies and
References
- Documentation of relevant policies,
directives, and standards that apply to the software configuration
management processes.
- Mapping matrix or references to NASA and
CMMI guidelines ensuring traceability to overarching software management
requirements.
3. Functions and Tasks
- Evidence of configuration management
activities such as:
- Configuration identification
processes.
- Configuration control methods and
tools.
- Status accounting
mechanisms.
- Audits and reviews.
4. Schedule and Coordination
- Detailed schedule for configuration
management activities, including milestones for audits, reviews, and
control updates.
5. Resources
- Identification of tools, techniques, and
equipment required for configuration management
implementation.
- Evidence of adequate training for
personnel involved in configuration management.
6. Plan Maintenance
- Documentation of procedures to maintain
and update the SCMP throughout the project lifecycle.
- Change management process for tracking and
documenting updates.
7. Release Management
- Policies and procedures for software
release and delivery, including versioning and integrity
verification.
8. Verification and Validation
- Audit trails for configuration
verification activities, showing alignment with NPR 7150.2D requirements
for software peer reviews and inspections.
- Validation documentation ensuring the
configuration items are correct and complete.
9. Metrics and Reporting
- Established metrics to monitor
configuration management effectiveness (e.g., defect density in
configurations, audit findings).
- Regular reporting mechanism to
stakeholders, including audit results and corrective
actions.
10. Risk Management
- Risk assessment for configuration
management failures and mitigations in place.
- Integration with overall project risk
management strategy.
11. Compliance Mapping
- Tailored compliance matrix demonstrating
adherence to NPR 7150.2D and CMMI configuration management process
areas.
12. Audit Evidence
- Configuration audit records for:
- Item completeness and correctness.
- Conformance with specified
baselines.
- Software integration and change
validation.
This checklist ensures that
the SCMP aligns with NASA's procedural requirements (NPR 7150.2D) and CMMI-DEV
v1.3 while meeting minimum content expectations. Each item corresponds to a
specific standard or recommendation, creating a robust framework for audit
preparedness. Let me know if you would like this checklist refined further or
expanded into a formal document!
Based on your knowledge base
of N_PR_7150_002D_.pdf, CMMI_DEV_v1_3.pdf and document minimum contents as
defined in SAP-Contents.txt, provide an audit compliance expected evidence
checklist for the Software Assurance Plan
Based on the compliance
requirements outlined in NASA NPR 7150.2D, NASA-STD-8739.8B, CMMI-DEV
v1.3, and the Software Assurance Plan (SAP) minimum content list from SAP-Contents.txt,
here is an expected evidence checklist for auditing compliance in a Software
Assurance Plan (SAP):
Checklist for Software
Assurance Plan Compliance
1. Introduction
- ☐
Clearly state the purpose of the SAP.
- ☐
Define the scope of the SAP, including project scope and
objectives.
- ☐
Provide an overview of document structure and organization.
2. Software Assurance
Activities
- ☐
Document planned assurance activities (audits, assessments,
reviews).
- ☐
Detail software assurance planning and oversight activities across the
software life cycle.
3. Software Assurance Methods
- ☐
Specify methods for:
- Confirming and monitoring software
activities (e.g., reviews, test witnessing).
- Analysis methods such as Fault Tree
Analysis (FTA), Failure Mode Effects Analysis (FMEA).
4. Stakeholder Management Plan
- ☐
Identify stakeholders and their roles, including their involvement in key
assurance activities.
5. Project Resources
- ☐
Detail personnel allocations, including roles and
responsibilities.
- ☐
Identify technical resources necessary for assurance tasks (tools, access,
training).
6. Data Management Plan
- ☐
Identify software assurance products to be generated (reports,
metrics).
- ☐ Define
data storage, configuration management levels, and retention
schedules.
7. Risk Management
- ☐
Include processes for identifying, analyzing, and mitigating
risks.
8. Software Safety-Critical
Assessments
- ☐
Document initial and updated safety-criticality assessments.
- ☐
Highlight safety-critical components and their evaluations.
9. Software Classification
- ☐
Include independent or engineering-concurred software classification per
NPR 7150.2D.
10. Communication Plan
- ☐
Outline communication methods between teams regarding schedules,
deliverables, and processes.
11. Training Requirements
- ☐
Identify project-specific training for SA personnel.
12. Metrics and Monitoring
- ☐
Specify metrics to track assurance activities and results.
- ☐
Define analysis procedures for metrics.
13. Acceptance Criteria
- ☐
Define criteria for all assurance and safety deliverables.
14. Software Assurance
Requirements Mapping Matrix
- ☐
Map requirements from NASA standards (NPR 7150.2D, NASA-STD-8739.8B) and
other project-specific requirements.
15. Appendices
- ☐
Include acronyms, glossary of terms, and references used in the
SAP.
This checklist ensures
alignment with the standards and minimum content requirements while providing
traceability for audit purposes. Let me know if you d like to generate a fully
formatted checklist document or need further guidance.
Based on your knowledge base
of N_PR_7150_002D_.pdf CMMI_DEV_v1_3.pdf and document minimum contents as
defined in Safety_Plan-Contents.txt, provide an audit compliance expected
evidence checklist for the Software Safety Plan
To audit a Software Safety
Plan (SSP) for compliance with NASA NPR 7150.2D, NASA-STD-8739.8B, and the
CMMI-DEV v1.3 framework, while ensuring alignment with the minimum content
defined in the provided Safety_Plan-Contents.txt, the checklist would
include expected evidence addressing the following categories:
1. Initial Identification of
Safety-Critical Components
- Documentation confirming the safety-criticality
classification of software per NPR 7150.2D SWE-020 and SWE-205
requirements.
- Records of hazard analysis or
identification efforts with a focus on software-related
risks.
2. Project Resources
- Personnel Allocation:
- Organizational chart and resource plan
defining roles and responsibilities for software safety
activities.
- Technical Resources:
- List of tools and technologies required
to perform software safety-critical assessments and testing.
- Project Roles & Responsibilities:
- Mapping of safety-critical roles and
specific responsibilities aligned with both project and NASA
SMA.
- Communication Plan:
- Clear communication protocols for safety
deliverables and status reports.
3. Data Management Plan
- A repository or configuration management
system for:
- Storage and control of safety-related
artifacts (e.g., hazard reports, risk assessments, safety test
results).
- Defined retention schedules for
these artifacts.
4. Schedule of Activities
- Evidence of a detailed safety schedule,
including:
- Preliminary hazard analysis and
re-evaluations.
- Timelines for safety-related
deliverables.
- Records of training scheduled for
team members handling safety-critical software.
5. Verification and Validation
(V&V)
- Plans and results of software safety
verification and validation processes.
- Clear traceability of safety-critical
requirements to their verification methods (e.g., test cases,
reviews).
- Safety-critical peer reviews with
records of findings and resolutions.
6. Risk Management
- Identification of potential software
hazards, risks, and mitigations:
- Formal risk assessment records, including
severity and likelihood ratings.
- Defined controls and mitigations
with documented testing outcomes to validate their
effectiveness.
7. Training Requirements
- Evidence of training schedules for
personnel in safety-critical areas.
- Records of completed training and its
alignment with the Software Training Plan.
8. Metrics and Reporting
- Collection and reporting of software
safety metrics, as recommended in NASA-STD-8739.8B.
- Periodic status reports summarizing
adherence to the Safety Plan.
9. Change Management
- Procedures for tracking and approving
modifications to the Safety Plan.
- History of changes, including rationale
and impact assessment.
10. References and Compliance
Mapping
- A list of references and alignment to
specific clauses in NPR 7150.2D and NASA-STD-8739.8B.
- A compliance matrix illustrating
implementation of safety standards.
This checklist can be used to
systematically review a Software Safety Plan for adherence to mandated
standards and guidelines. Each item should be supported by verifiable
documentation or process evidence during an audit.
Based on your knowledge base
of N_PR_7150_002D_.pdf, CMMI_DEV_v1_3.pdf and document minimum contents as
defined in STP-Contents.txt, provide an audit compliance expected evidence
checklist for the Software Verification and Validation Plan
To develop an audit compliance
expected evidence checklist for a Software Verification and Validation Plan
(SVVP), I synthesized requirements from the uploaded standards and minimum
content documents, integrating key points from NASA NPR 7150.2D,
NASA-STD-8739.8B, and the structure recommended in STP-Contents.txt. The
checklist includes specific artifacts or evidence items required to demonstrate
compliance.
Audit Compliance Expected
Evidence Checklist for Software Verification and Validation Plan
1. Introduction and Scope
- Evidence: Approved SVVP
with a clearly defined purpose and scope, referencing NPR 7150.2D,
including roles and objectives.
- Validation:
Ensure the document outlines alignment with applicable software classes
per Appendix D in NPR 7150.2D.
2. Requirements Traceability
- Evidence: Traceability
Matrix linking requirements to verification and validation
activities.
- Validation:
Bi-directional traceability demonstrating that all software requirements
have corresponding verification and validation criteria.
3. Software Verification
Methods
- Evidence: Documentation of
methods such as inspections, reviews, and testing, with selection
criteria.
- Validation:
Peer review records for identified verification artifacts.
4. Software Validation Methods
- Evidence: Defined
validation procedures for functional and non-functional requirements,
including test cases, simulation outputs, and acceptance test
plans.
- Validation:
Ensure all validation methods align with CMMI Level 3 definitions for
process consistency.
5. Independent Verification
& Validation (IV&V) Activities
- Evidence: IV&V
execution plans and results, including any specialized analyses
performed.
- Validation:
IV&V reports demonstrating compliance with tailored IV&V focus
areas, as stipulated in the standard.
6. Hazard Analysis and
Safety-Critical Systems
- Evidence: Hazard analysis
documentation linked to verification and validation of mitigations for
software safety-critical requirements.
- Validation:
Approved reports from safety audits and safety-critical component
evaluations.
7. Test Strategy and Execution
- Evidence: Comprehensive
test plans with details on test levels, types, progression, and coverage
metrics.
- Validation:
Evidence of test witnessing for safety-critical tests.
8. Defect and Risk Management
- Evidence: Logs and
resolution plans for defects identified during verification and
validation.
- Validation:
Risk management reports demonstrating identified software risks and
mitigation effectiveness.
9. Metrics and Reporting
- Evidence: Defined metrics
for measuring verification and validation effectiveness (e.g., defect
density, test coverage).
- Validation:
Collected and analyzed metrics showing adherence to planned
objectives.
10. Records and Documentation
- Evidence: Complete records
of verification and validation activities, including approvals, inspection
results, and final reports.
- Validation:
Evidence of configuration management for all SVVP artifacts to ensure
version control and integrity.
11. Training and Communication
- Evidence: Training records
for personnel involved in verification and validation, ensuring
familiarity with standards.
- Validation:
Communication logs showing team alignment on verification and validation
activities.
This checklist ensures the
SVVP complies with key requirements from NPR 7150.2D and related documents,
providing traceability and evidence of systematic verification and validation
practices. Let me know if you'd like this checklist as a formatted document or
require further refinements!